Talabre
VIII Etapa

CODELCO’s project VIII of the Talabre Dam consisted of increasing the height of the wall by six meters, in 2019 the cant finished at the final elevation of all the walls, as well as the start of operations and the water recovery system. Our supply consisted of Rubber Lined Steel Spools for Tailings